arcgrid
AG-24Construction pack

ArcBuild

Project intelligence from bid to closeout. RFI and submittal tracking, subcontractor coordination, change order management, and punch list handling for teams where the schedule is the contract.

FirmNetwork
AG-24.1Workflows

The cycles this pack works

01

RFI management

Incoming requests logged, deadlines tracked, responses prepared with relevant specification sections and drawing references attached before anything goes out.

02

Submittal tracking

Submittals staged through the design-team review cycle, logged at every step with ball-in-court clarity. Nothing stalls without someone's name on it.

03

Change order management

Change events captured as they occur, cost impacts assembled against the contract, backup documentation attached before any number is shared with the owner.

04

Subcontractor coordination

Scope gaps, schedule conflicts, and lien waiver queues prepared for your review. The paperwork your project depends on, ready before you need it.

AG-24.2On your Surface

What rises, ready for your call

RFI response ready

RFI #142 response drafted. Drawing references attached. Deadline in 48 hours. Awaiting your release.

Change event logged

Directive 09 captured. Cost impact assembled at three alternatives. Backup on file. Nothing goes to the owner until you commit.

Lien waiver queued

Mechanical sub conditional waiver for Payment App 7 prepared. Contract terms verified. Awaiting your signature.

Standard of care: no RFI response, change order, or contractual notice leaves the project without a named human commit. The schedule is the contract, and the trail proves you honored it.

Status. In early development. Scope and workflows are being shaped with founding construction operators before general availability.